Click on photos for larger images

Training Guide 1: Large Staybills

Training Guide 2: Small & Medium Staybills

Assembly - less than 1 minute per metre to erect!

4-STEP ASSEMBLY APPLIES TO ALL 3-SIZES

Assembly is remarkably simple and a 4m system can be fully assembled in circa 4 minutes by a single operative standing upon the ground and without the need for ANY tools at all. Dis-assembly takes 50% of this time and is the reverse of the assembly steps

There are just 4 steps:

STEP 1

Using a Double Staybill at the end or return, set out using the spacer bars. Then lay the scaffold boards and load materials. Use hop-up boards when the Large size is near or at the maximum height.

STEP 2

Insert the Posts - hooks facing the boards - place the Ladder Restraint - usually to one end.

STEP 3

Hang the solid panels under the Ladder Restraint leaving alternative gaps for the hinged panels if required, then hang the hinged panels.

STEP 4

Secure the ladder and use the safety gate bar or solid panel to provide full protection.

Staybills - incorporate two types of 1100mm high panels - solid or hinged - both having integral handrails, toeboard and full steel 50x50mm mesh protection - no need for brickguards!

Copyright Staybills 2004- 2014